[PATCH v2] sched: let __sched_period() use rq's nr_running

From: byungchul . park
Date: Fri Jul 10 2015 - 04:14:57 EST


From: Byungchul Park <byungchul.park@xxxxxxx>

__sched_period() returns a period which a rq can have. the period has to be
stretched by the number of task *the rq has*, when nr_running > nr_latency.
otherwise, task slice can be very smaller than sysctl_sched_min_granularity
depending on the position of tg hierarchy when CONFIG_FAIR_GROUP_SCHED.

Signed-off-by: Byungchul Park <byungchul.park@xxxxxxx>
---
kernel/sched/fair.c | 2 +-
1 file changed, 1 insertion(+), 1 deletion(-)

diff --git a/kernel/sched/fair.c b/kernel/sched/fair.c
index 09456fc..8ae7aeb 100644
--- a/kernel/sched/fair.c
+++ b/kernel/sched/fair.c
@@ -635,7 +635,7 @@ static u64 __sched_period(unsigned long nr_running)
*/
static u64 sched_slice(struct cfs_rq *cfs_rq, struct sched_entity *se)
{
- u64 slice = __sched_period(cfs_rq->nr_running + !se->on_rq);
+ u64 slice = __sched_period(rq_of(cfs_rq)->nr_running + !se->on_rq);

for_each_sched_entity(se) {
struct load_weight *load;
--
1.7.9.5

--
To unsubscribe from this list: send the line "unsubscribe linux-kernel" in
the body of a message to majordomo@xxxxxxxxxxxxxxx
More majordomo info at http://vger.kernel.org/majordomo-info.html
Please read the FAQ at http://www.tux.org/lkml/