[PATCH] sched/deadline: Fix a bug in dl_overflow()

From: Xunlei Pang
Date: Thu Apr 14 2016 - 08:19:49 EST


I got a minus(very big) dl_b->total_bw during my deadline tests.

# grep dl /proc/sched_debug
dl_rq[0]:
.dl_nr_running : 0
.dl_bw->bw : 996147
.dl_bw->total_bw : -222297900

Something unusual must have happened.

After some digging, I finally noticed that when changing a deadline
task to normal(cfs), and changing it back to deadline immediately,
after it died, we will got the wrong dl_bw->total_bw.

The root cause is in dl_overflow(), it has:
if (new_bw == p->dl.dl_bw)
return 0;

1) When a deadline task is changed to !deadline task, it will start
dl timer in switched_from_dl(), and retain previous deadline parameter
till the timer expires.
2) If we change it back to deadline with the same bandwidth parameter
before the timer expires, as it keeps the old bandwidth although it
is not a deadline task. dl_overflow() simply returns success without
updating the right data, and got the wrong dl_bw->total_bw.

The solution is simple, if @p is not deadline, don't return.

Signed-off-by: Xunlei Pang <xlpang@xxxxxxxxxx>
---
kernel/sched/core.c | 3 ++-
1 file changed, 2 insertions(+), 1 deletion(-)

diff --git a/kernel/sched/core.c b/kernel/sched/core.c
index 4a2c79d..5988fee 100644
--- a/kernel/sched/core.c
+++ b/kernel/sched/core.c
@@ -2378,7 +2378,8 @@ static int dl_overflow(struct task_struct *p, int policy,
u64 new_bw = dl_policy(policy) ? to_ratio(period, runtime) : 0;
int cpus, err = -1;

- if (new_bw == p->dl.dl_bw)
+ /* !deadline task may carry old deadline bandwidth */
+ if (new_bw == p->dl.dl_bw && task_has_dl_policy(p))
return 0;

/*
--
1.8.3.1