On 25 March 2017 at 04:48, Joel Fernandes <joelaf@xxxxxxxxxx> wrote:
> Hi Vincent,
>
> On Thu, Mar 23, 2017 at 3:08 PM, Vincent Guittot
> <vincent.guittot@xxxxxxxxxx> wrote:
> [..]
>>>>
>>>>> So I'm not really aligned with the description of your problem: PELT
>>>>> metric underestimates the load of the CPU. The PELT is just about
>>>>> tracking CFS task utilization but not whole CPU utilization and
>>>>> according to your description of the problem (time stolen by irq),
>>>>> your problem doesn't come from an underestimation of CFS task but from
>>>>> time spent in something else but not accounted in the value used by
>>>>> schedutil
>>>>
>>>> Quite likely. Indeed, it can really be that the CFS task is preempted
>>>> because of some RT activity generated by the IRQ handler.
>>>>
>>>> More in general, I've also noticed many suboptimal freq switches when
>>>> RT tasks interleave with CFS ones, because of:
>>>> - relatively long down _and up_ throttling times
>>>> - the way schedutil's flags are tracked and updated
>>>> - the callsites from where we call schedutil updates
>>>>
>>>> For example it can really happen that we are running at the highest
>>>> OPP because of some RT activity. Then we switch back to a relatively
>>>> low utilization CFS workload and then:
>>>> 1. a tick happens which produces a frequency drop
>>>
>>> Any idea why this frequency drop would happen? Say a running CFS task
>>> gets preempted by RT task, the PELT signal shouldn't drop for the
>>> duration the CFS task is preempted because the task is runnable, so
>>
>> utilization only tracks the running state but not runnable state.
>> Runnable state is tracked in load_avg
>
> Thanks. I got it now.
>
> Correct me if I'm wrong but strictly speaking utilization for a cfs_rq
> (which drives the frequency for CFS) still tracks the blocked/runnable
> time of tasks although its decayed as time moves forward. Only when we
> migrate the rq of a cfs task is the util_avg contribution removed from
> the rq. But I can see now why running RT can decay this load tracking
> signal.

Yes. you're right


>
> Regards,
> Joel