[PATCH] sched/cputime: code refactoring in cputime_adjust()

From: Gustavo A. R. Silva
Date: Thu Jun 29 2017 - 14:41:41 EST


Value assigned to variable utime at line 619:utime = rtime;
is overwritten at line 642:utime = rtime - stime; before it
can be used. This makes such variable assignment useless.

Remove this variable assignment and refactor the code related.

Addresses-Coverity-ID: 1371643
Cc: Frans Klaver <fransklaver@xxxxxxxxx>
Signed-off-by: Gustavo A. R. Silva <garsilva@xxxxxxxxxxxxxx>
---
kernel/sched/cputime.c | 16 +++++-----------
1 file changed, 5 insertions(+), 11 deletions(-)

diff --git a/kernel/sched/cputime.c b/kernel/sched/cputime.c
index aea3135..a83fd9a 100644
--- a/kernel/sched/cputime.c
+++ b/kernel/sched/cputime.c
@@ -615,19 +615,13 @@ static void cputime_adjust(struct task_cputime *curr,
* userspace. Once a task gets some ticks, the monotonicy code at
* 'update' will ensure things converge to the observed ratio.
*/
- if (stime == 0) {
- utime = rtime;
- goto update;
+ if (stime != 0) {
+ if (utime == 0)
+ stime = rtime;
+ else
+ stime = scale_stime(stime, rtime, stime + utime);
}

- if (utime == 0) {
- stime = rtime;
- goto update;
- }
-
- stime = scale_stime(stime, rtime, stime + utime);
-
-update:
/*
* Make sure stime doesn't go backwards; this preserves monotonicity
* for utime because rtime is monotonic.
--
2.5.0