Re: [PATCH 1/2] sched/schedutil: rework performance estimation
From: Ingo Molnar
Date: Fri Oct 13 2023 - 14:21:07 EST
* Vincent Guittot <vincent.guittot@xxxxxxxxxx> wrote:
> +
> + /* The minimum utilization returns the highest level between:
> + * - the computed DL bandwidth needed with the irq pressure which
> + * steals time to the deadline task.
> + * - The minimum bandwidth requirement for CFS.
> + */
Nit: please use the standard multi-line Linux kernel comment style.
> + /* The maximum hint is a soft bandwidth requirement which can be lower
> + * than the actual utilization because of max uclamp requirments
> */
Ditto.
> +unsigned long sugov_effective_cpu_perf(int cpu, unsigned long actual,
> + unsigned long min,
> + unsigned long max)
> +{
> + unsigned long target;
> + struct rq *rq = cpu_rq(cpu);
> +
> + if (rt_rq_is_runnable(&rq->rt))
> + return max;
> +
> + /* Provide at least enough capacity for DL + irq */
> + target = min;
s/ / /
s/irq/IRQ/
Thanks,
Ingo