Re: [PATCH v2 net 1/7] net/sched: taprio: fix too early schedules switching

From: Abdul Rahim, Faizal
Date: Wed Nov 15 2023 - 06:54:27 EST




On 9/11/2023 6:27 am, Vladimir Oltean wrote:
On Tue, Nov 07, 2023 at 06:20:17AM -0500, Faizal Rahim wrote:
In the current taprio code for dynamic schedule change,
admin/oper schedule switching happens immediately when
should_change_schedules() is true. Then the last entry of
the old admin schedule stops being valid anymore from
taprio_dequeue_from_txq’s perspective.

Admittedly, I may have become a bit detached from this code base in the
past months, but I don't understand the reasoning here.

Could you please explain what makes the last entry of the old admin
schedule be invalid from taprio_dequeue_from_txq()'s perspective?

What I see is that when should_change_schedules() is true, we change
q->oper_sched and q->admin_sched through the switch_schedules() call,
but we don't change q->current_entry, so I fail to understand the
connection you are implying.

My bad – I used part of the explanation from the original author without thoroughly checking it. I have some guesses about taprio_dequeue_from_txq(), but they're not solid without more testing.

So, I'll swap it with your suggestion below, which highlights the obvious issue.

On the other hand (and I see I did mention this in the other thread),
it seems that taprio_skb_exceeds_queue_max_sdu() - called from the
enqueue() path - looks at q->oper_sched, and that's a valid reason why
we'd want to delay the schedule switch until admin's actual base time,
rather than the current oper's cycle_end_time.

Agree, observed this too.


But please, let's spare no expense in providing a proper problem
description, justification for the change and Fixes: tag. This is not
optional.

To solve this, we have to delay the switch_schedules() call via
the new cycle_time_correction variable. The variable serves 2
purposes:
1. Upon entering advance_sched(), if the value is set to a
non-initialized value, it indicates that we need to change
schedule.
2. Store the cycle time correction value which will be used for
negative or positive correction.

It needs to be stated much more clearly that only purpose 1 is relevant
here (I would even go as far as to omit its secondary purpose here).
The only reason we are using the correction variable is because it
happens that we'll need that in later changes.

Got it.



Fixes: a3d43c0d56f1 ("taprio: Add support adding an admin schedule")

I believe that since the only observable problem has to do with
taprio_skb_exceeds_queue_max_sdu(), the Fixes: tag should be the commit
which added that logic. Which is:

Fixes: a878fd46fe43 ("net/sched: keep the max_frm_len information inside struct sched_gate_list")

Will replace the patch explanation with this. Thanks.

Signed-off-by: Faizal Rahim <faizal.abdul.rahim@xxxxxxxxxxxxxxx>
---
net/sched/sch_taprio.c | 9 +++++++--
1 file changed, 7 insertions(+), 2 deletions(-)

diff --git a/net/sched/sch_taprio.c b/net/sched/sch_taprio.c
index 2e1949de4171..dee103647823 100644
--- a/net/sched/sch_taprio.c
+++ b/net/sched/sch_taprio.c
@@ -41,6 +41,7 @@ static struct static_key_false taprio_have_working_mqprio;
#define TXTIME_ASSIST_IS_ENABLED(flags) ((flags) & TCA_TAPRIO_ATTR_FLAG_TXTIME_ASSIST)
#define FULL_OFFLOAD_IS_ENABLED(flags) ((flags) & TCA_TAPRIO_ATTR_FLAG_FULL_OFFLOAD)
#define TAPRIO_FLAGS_INVALID U32_MAX
+#define INIT_CYCLE_TIME_CORRECTION S64_MIN

I would prefer naming it CYCLE_TIME_CORRECTION_INVALID or _UNSPEC.
It is not just used as the "initial" value.

struct sched_entry {
/* Durations between this GCL entry and the GCL entry where the
@@ -75,6 +76,7 @@ struct sched_gate_list {
ktime_t cycle_end_time;
s64 cycle_time;
s64 cycle_time_extension;
+ s64 cycle_time_correction;
s64 base_time;
};
@@ -940,8 +942,10 @@ static enum hrtimer_restart advance_sched(struct hrtimer *timer)
admin = rcu_dereference_protected(q->admin_sched,
lockdep_is_held(&q->current_entry_lock));
- if (!oper)
+ if (!oper || oper->cycle_time_correction != INIT_CYCLE_TIME_CORRECTION) {

You could introduce even as early as this change a "static bool
sched_switch_pending(struct sched_gate_list *oper)" function, which
incorporates the entire body of this "if" expression.

+ oper->cycle_time_correction = INIT_CYCLE_TIME_CORRECTION;
switch_schedules(q, &admin, &oper);
+ }
/* This can happen in two cases: 1. this is the very first run
* of this function (i.e. we weren't running any schedule
@@ -981,7 +985,7 @@ static enum hrtimer_restart advance_sched(struct hrtimer *timer)
* schedule runs.
*/
end_time = sched_base_time(admin);
- switch_schedules(q, &admin, &oper);
+ oper->cycle_time_correction = 0;
}
next->end_time = end_time;
@@ -1174,6 +1178,7 @@ static int parse_taprio_schedule(struct taprio_sched *q, struct nlattr **tb,
}
taprio_calculate_gate_durations(q, new);
+ new->cycle_time_correction = INIT_CYCLE_TIME_CORRECTION;
return 0;
}
--