Re: [PATCH v2] sched: Don't try to catch up excess steal time.
From: Srikar Dronamraju
Date: Thu Sep 12 2024 - 10:49:02 EST
* Suleiman Souhlal <suleiman@xxxxxxxxxx> [2024-09-11 20:15:22]:
> When steal time exceeds the measured delta when updating clock_task, we
> currently try to catch up the excess in future updates.
> However, this results in inaccurate run times for the future things using
> clock_task, as they end up getting additional steal time that did not
> actually happen.
>
> For example, suppose a task in a VM runs for 10ms and had 15ms of steal
> time reported while it ran. clock_task rightly doesn't advance. Then, a
> different taks runs on the same rq for 10ms without any time stolen in
> the host.
> Because of the current catch up mechanism, clock_sched inaccurately ends
> up advancing by only 5ms instead of 10ms even though there wasn't any
> actual time stolen. The second task is getting charged for less time
> than it ran, even though it didn't deserve it.
> This can result in tasks getting more run time than they should actually
> get.
>
> So, we instead don't make future updates pay back past excess stolen time.
>
> Signed-off-by: Suleiman Souhlal <suleiman@xxxxxxxxxx>
> ---
> v2:
> - Slightly changed to simply moving one line up instead of adding
> new variable.
>
> v1: https://lore.kernel.org/lkml/20240806111157.1336532-1-suleiman@xxxxxxxxxx
> ---
After moving the line up, this looks good to me.
Reviewed-by: Srikar Dronamraju <srikar@xxxxxxxxxxxxx>
--
Thanks and Regards
Srikar Dronamraju