Re: [RFC][PATCH 1/2] sched: Extended scheduler time slice
From: Peter Zijlstra
Date: Sat Feb 01 2025 - 13:12:05 EST
On Sat, Feb 01, 2025 at 07:47:32AM -0500, Steven Rostedt wrote:
>
>
> On February 1, 2025 6:59:06 AM EST, Peter Zijlstra <peterz@xxxxxxxxxxxxx> wrote:
>
> >I still have full hate for this approach.
>
> So what approach would you prefer?
The one that does not rely on the preemption method -- I think I posted
something along those line, and someone else recently reposted something
bsaed on it.
Tying things to the preemption method is absurdly bad design -- and I've
told you that before.