Re: [PATCH v3] interconnect: qcom: qcs8300: fix the num_links for nsp icc node

From: Dmitry Baryshkov

Date: Tue Jan 20 2026 - 18:00:34 EST


On Tue, Jan 20, 2026 at 09:30:10AM +0000, Raviteja Laggyshetty wrote:
> The qxm_nsp node is configured with an incorrect num_links value,
> causing remoteproc driver to fail probing because it cannot acquire the
> interconnect path for qxm_nsp -> ebi. This results in the following
> error in dmesg:
>
> platform 26300000.remoteproc: deferred probe pending:
> qcom_q6v5_pas: failed to acquire interconnect path
>
> Set num_links to 2 to match the two link_nodes, allowing remoteproc
> clients to obtain the correct path handle and vote on qxm_nsp -> ebi.
>
> Fixes: 874be3339c85 ("interconnect: qcom: qcs8300: convert to dynamic IDs")
> Signed-off-by: Raviteja Laggyshetty <raviteja.laggyshetty@xxxxxxxxxxxxxxxx>

Reviewed-by: Dmitry Baryshkov <dmitry.baryshkov@xxxxxxxxxxxxxxxx>


--
With best wishes
Dmitry