Re: [PATCH v2 05/16] clk: qcom: gcc-sm8650: Tie the CX power domain to controller

From: Konrad Dybcio

Date: Thu Aug 20 2026 - 06:33:48 EST


On 8/20/26 12:07 PM, Abel Vesa wrote:
> Enable runtime PM for the controller, allowing CX to be powered down
> once all GCC consumers have released their clocks and GDSCs.
>
> Signed-off-by: Abel Vesa <abel.vesa@xxxxxxxxxxxxxxxx>
> ---

Reviewed-by: Konrad Dybcio <konrad.dybcio@xxxxxxxxxxxxxxxx>

Konrad