Re: [PATCH] sched/cache: Check reduced capacity before alb_break_llc()
From: Zhan Xusheng
Date: Sat Oct 31 2026 - 05:25:04 EST
Hi Tim,
On Fri, 2026-10-30 at 16:24 -0700, Tim Chen wrote:
> 1) There could be other idle CPUs in the preferred LLC. It would be
> better for the task to move to one of them, through the idle balance
> on those CPUs (via same reduced capacity check), than to move to a non-preferred LLC now.
Right. With CPU1 idle and 60% IRQ load on CPU0, mainline moved the
task to CPU1 in all 4 runs. With the patch it went to CPU2, in the
other LLC, in 2 of 4.
> 2) There could be ping pong migrations. Cache aware scheduling could
> move the task back to the CPU, because with only IRQ load on it, that
> CPU is considered idle. I think this would also need to be dealt with.
>
> Could you check nr_migrations in /proc/<pid>/sched, or trace
> sched_migrate_task, over the 20 seconds on your setup
> before and after your patch? A run with 20% to 40% irq load would also help.
It does ping-pong. nr_migrations of the busy thread in the 19 s after
its affinity is widened, CPU1 busy, one value per run:
IRQ load mainline patched iterations/s
20% 2, 6, 8, 20 8, 11, 12, 13 4.2e7 -> 5.2e7
40% 0, 2, 2, 10 5, 9, 16, 43 3.1e7 -> 5.1e7
60% 0, 0, 0, 16 7 to 36 (7 runs), 1.9e7 -> 5.0e7
327 (1 run)
At 60% the extra migrations come in bursts of 0->2 and 2->0 round
trips about 4 ms apart. A kprobe on __active_load_balance_cpu_stop
shows the 2->0 moves run with LBF_ACTIVE_LB_LLC, so they are the cache
aware pull back, and the 0->2 moves are this patch.
So the override needs both of your conditions: no idle CPU in the
preferred LLC with more capacity, and no pull back onto a CPU whose
capacity is reduced. I'll work on a v2 along those lines.