Re: [PATCH net v4 3/4] igb: link queues to NAPIs under RTNL after runtime resume
From: Antonio Quartulli
Date: Tue Nov 24 2026 - 18:56:57 EST
On 24/11/2026 22:38, netdev-bot+sashiko@xxxxxxxxxx wrote:
Thank you for your contribution! Sashiko AI review found 1 potential
issue(s) to consider.
Critical: 0 · High: 0 · Medium: 1 (1) · Low: 0
If you believe none of the issues are legitimate, please reply to each
issue of Medium severity or higher and explain why the AI is wrong.
If any of them are legitimate and you plan to respin, please let patchwork
know by including "pw-bot: cr" as a separate line at the end of your reply
(one such reply per series is enough).
- [Medium] igb_rtnl_resume_task() now calls igb_link_queue_napis(), which
reads adapter->num_q_vectors and dereferences adapter->q_vector[i]…
Right, nothing cancelled the work item on suspend. v5 cancels it at the
start of __igb_shutdown(), before taking RTNL, so it only runs after
the resume that scheduled it allocated the q_vectors.
Pre-existing issues:
- [Medium] This problem wasn't introduced by this patch, but igc has the
same bug.
yes, an igc fix is planned and will be sent separately once it has
been tested on igc hardware.
Regards,
--
Antonio Quartulli
CEO and Co-Founder
Mandelbit Srl
https://www.mandelbit.com