Re: [PATCH v8 1/4] usb: gadget: gadgetfs: fix ep0 request lifetime and buffer races
From: Alan Stern
Date: Wed Nov 25 2026 - 22:16:02 EST
At last, I finally got some time to go over this material.
On Tue, Nov 10, 2026 at 12:13:22PM +0800, Jing Lin via B4 Relay wrote:
> From: Jing Lin <kayano050408@xxxxxxxxx>
>
> gadgetfs_unbind() frees the preallocated ep0 request after disconnecting
> the gadget, assuming that no I/O remains active.
>
> With controllers such as dummy_hcd, disconnecting does not necessarily
> drain ep0, so a delayed userspace response can leave dev->req queued
> when it is freed. This triggers the warning in dummy_free_request() and
> a use-after-free when dummy_udc_stop() subsequently drains the endpoint
> queue.
This is a genuine problem.
> gadgetfs_setup() and the userspace copy helpers also race on dev->req
> and req->buf:
>
> 1. ep0_read() versus gadgetfs_setup(). A delegated control OUT request
> is queued by gadgetfs_setup() and completed by ep0_complete(), which
> leaves the payload in dev->req->buf and sets setup_out_ready.
> ep0_read() copies that payload with copy_to_user() after dropping
> dev->lock, so the copy can fault and sleep. If a new control
> transfer arrives during that window, gadgetfs_setup() reuses dev->req
> for it; for example, GET_DESCRIPTOR(config) points req->buf at
> dev->config. When ep0_read() resumes, clean_req() frees whatever
> req->buf points to, which is now dev->config.
But this isn't. Or at least, your analysis is incomplete.
The real problem here is that gadgetfs does not handle "aborted"
control-OUT transfers correctly. The request for the OUT data stage is
submitted when the setup packet arrives, and the host is told that the
transfer was successful when the request completes correctly, but the
user program doesn't receive the data until some time later. And if
another control transfer arrives in the meantime, "aborting" the earlier
transfer, the user program doesn't ever receive the data. It's not good
for the host and the peripheral to disagree over whether a transfer was
successful!
The start of a new transfer should not be allowed to erase all knowledge
of a properly completed control-OUT transfer until the data has been
read. Instead, the gadget should NAK the new transfer until then (i.e.,
not submit any request in response to the new setup).
Fixing that will be a fairly substantial change. Furthermore, this
whole issue is so entirely different from the race involving
gadgetfs_unbind() above that it belongs in its own patch.
> 2. ep0_write() versus gadgetfs_setup(). For a delegated control IN
> request, ep0_write() prepares dev->req and copies the response from
> userspace with copy_from_user() after dropping dev->lock. A control
> request that arrives during that copy can point req->buf at dev->dev
> or dev->config, so the userspace copy overwrites a descriptor buffer,
> or reset req->buf to dev->rbuf so completion calls clean_req() on the
> wrong object.
It should be possible to handle this problem without copying the buffer.
For instance, the user data could be put in its own kmalloc-ed buffer
instead of in dev->rbuf.
> Copy completed control OUT payloads into a private setup_buf in
> ep0_complete(), copy control IN payloads into a stack buffer before
> preparing dev->req and leaving STATE_DEV_SETUP in ep0_write(), and track
> buffers allocated by setup_req() separately in dev->ep0_req_buf so
> clean_req() never frees descriptor storage. Ignore zero-length reads
> while a non-zero control OUT data stage is pending so they cannot queue
> a status request early and clobber setup_out_len.
>
> Submit ep0 requests through a shared queue_ep0_req() helper that tracks
> dev->ep0_req_queued and wakes dev->wait whenever the flag clears. In
> gadgetfs_unbind(), tear down non-ep0 endpoints first, then dequeue any
> active ep0 request and wait under dev->lock with wait_event_lock_irq()
> for completion to finish. If the controller rejects ep0 dequeue, keep a
> reference on dev and let the completion handler free the request when
> udc_stop() drains ep0.
These descriptions are a little confusing to read, because they mix
together your solutions to three separate problems. Each solution
really should be in its own patch.
Also, don't worry about a rejected dequeue call. In practice, the only
reason such a call can fail is because the request to be dequeued has
already completed (or was never successfully submitted in the first
place).
Alan Stern